Above is an overview shot of the whole process--the only breaks for the people shovelling and tossing ingredients into the mixer came in the five minute intervals in which we added rock layers. The cable sag was set on Friday. We thought this would be harder than it was (but also quicker). Because our sag is much lower than the typical B2P design (3.50% versus 5%), the cables had to be pulled to nearly horizontal in order to set them in the right place. This step is the only very dangerous step, as the winch and the cable it is attached to are under very high tension. Luckily, there were no incidents.
Above, Maria takes out some anger on the cables (actually whacking it with a stick is a proper way to fine-tune the sag). Below, Steve completing the first crossing of the bridge. Unfortunately, Steve had to leave (and should be airborne as of this post), but we did get to within a day or two of a completely usable bridge--although ours is currently completely usable for any tightrope walkers in the San Francisco area).
On Thursday, we went to the community leader's house (which also serves as San Francisco's elementary school, serving 20 students) for dinner, and after took a walking tour of San Francisco. It was amazing that seemingly every household we passed had several people who are regularly volunteering their time to work on the bridge. We also got to travel a bit this weekend, and while in Managua to see Steve off, we all got to go to Masaya, to both its artisan markets and its active volcano, Granada, a colonial city founded in 1524, and Lake Nicaragua, a huge expanse which contains several volcanoes in addition to its freshwater sharks.
Above is a picture of a friend who came to help us out at the bridge site one day. Unfortunately, he passed away shortly thereafter. Below, a picture of our most recent progress. Can't wait to show pictures after another week!
No comments:
Post a Comment